See below how Insulation Solutions by ISOVER can contribute to LEED criteria: Construction and demolition waste management

    Read more
    The number of points is given for only information purpose. Saint-Gobain, in anyway, shall not guarantee or not be held liable for non-fulfillment of the certification which includes a broader package than constructions products employed for the targeted building.
    2 points

    You have a question? You are looking for a documentation? You need more information?

    Don't hesitate to contact our team, we will be pleased to help you.

    Contact us!

    Aim

    To reduce construction and demolition waste disposed of in landfills and incineration facilities by recovering, reusing, and recycling materials.

    Detailed requirement

    The project has to recycle and/or salvage non-hazardous construction and demolition materials, with the following options:

    Option 1: diversion of the construction and demolition material (50 or 75%);

    Option 2: reduction of total waste material (no more than 12.2kg of waste per m2).

    Read the detailed requirement for Construction and Demolition Waste Management

    Our contribution

    By providing a recycling service in some countries, ISOVER can contribute to reducing insulation waste.

    Due to our green building heritage, waste management is a very important topic for ISOVER and we have started to develop recycling schemes in different countries to manage insulation waste. Mineral wool and polystyrene can become new insulation by being properly collected, sorted out and processed, as they are recyclable materials.

    Please refer to your local team to learn more about the available options.

    isover_wood

    Services block

    isover_recycling_france
    ISOVER France works with a network of collectors. They look after the construction and deconstruction waste and take back waste to the plant
    slovakia_isover
    ISOVER Slovakia offers recycling service for EPS Waste. The unused EPS from construction sites are collected, & recycled in the plant.