See below how Metal ceilings by Gabelex can contribute to LEED V4.0 criteria: Construction and demolition waste management
Aim
To reduce construction and demolition waste disposed of in landfills and incineration facilities by recovering, reusing, and recycling materials.
Detailed requirement
The project has to recycle and/or salvage non-hazardous construction and demolition materials, with the following options:
Option 1: diversion of the construction and demolition material (50 or 75%);
Option 2: reduction of total waste material (no more than 12.2kg of waste per m2).
Read the detailed requirement for Construction and Demolition Waste Management
Our contribution
On jobsite there are few cut off for adjustment as Gabelex metal ceilings are made to measure, which lead to maximum 5% of waste.
During its lifetime, Gabelex metal ceilings could be easily removable for reuse.
In addition, the product is 100% recyclable at the end of its life and contained recycled content (value depending on suppliers).